I have told them a few times to take me off thier email list but just had this one through... sounds like they are pushing the installers to condemn the existing boilers for no services records??? etc. in order to rush the installs through
HI All
we are starting the new fund run by us middle of next week , we have payment within 2 weeks after each weeks submission so this will shorten the pay scale to around 3 weeks – 28days . The pay is £225.00 an install for terrace and £250.00 for others , we order all the parts indicated on your pre survey report the correct ofgem form and survey is attached all boiler are being provided without direct cost to us and we will be fitting Baxi duo tec / system and heat only do not require sparky as they have digital thermo and clock , you will get a 20 m flex flu extension and an inline filter and flu .
You can never order parts from our account ever , it is a sack able offence, any parts ordered on survey that do not appear on the job will cause us to end your employment and the cost will be taken from your wages, any parts you forget on the survey you will provide yourselves, we have employed semi retired engineers to spot check work for parts ordered this is due to theft from the last set of installs .
I cannot stress enough that the paperwork must be returned each evening or by 7.00am the next day, failure to do so will stop your installs for the next day ( no exceptions ) late paperwork will incur fines of £10.00 for every day late and / or end your employment with us, so get a scanner before you start up , a boiler installed without paperwork cannot be paid by the provider or us so you will be wasting your time, each document must be sent on one email and individual photos 1 email per home fitted for the new iPad submission software , if your not sure how to fill out the paperwork you need to ask us before you attempt to do a fit .
New paperwork to follow before Monday
Under the following conditions you must condemn the boiler put a sticker on it and cap off gas, although some are a little over zealous the rules recently have been tightened listing other faults as well . (this will be starting from 21[SUP]st[/SUP] June 2013-next Friday)
PARTS OF FLU HIDDEN NO HATCH
ROOM SEALED BOILERS ( as above )
INSUFFCIANT COOLING / VENTING
EXCESS CARBON MONO ( of course) flu analyser fails .
INLET PRESSURE –DUE TO UNDERSIZE GAS SUPPLY
MECHANICAL STABILITY PROBLEMS ( loose fitting boiler )
CHEMICAL GAS DAMAGE
GAS LEAK
NOT BEEN SERVICED REGUALARY ( this could be common must see proof or condemn )
WORN THERMOCOUPLE
CORODED FLU
CASING DETERIATION
A condemned sticker is required and give the customer a copy of gas check find out if they have a secondary heating system to tide them over for a maximum of 5 days before you reinstall of new boiler, all condemned boilers will be fast tracked to install.
Kind Regards