Hi there. Could you guys give me the sequence of works on a like for like bathroom replacement with bath ped basin and toilet. When does the tiler come in or do you use wood at tile thickness underneath the ceramic etc. do the floors and walls need to be assessed for level,rot etc. I think im starting to realise tiling would be a handy skill to have along with plumbing then you could do the whole lot. many thanks.
 
should be plumb first fix, then maybe chippy comes in to box in pipework if required, then plasterers to come and skim wall again if req. then floor layers, if you are having a new floor rg for a wet room, then tilers, then you should plumb 2nd fix, eg fit shower, plumb in bath ect ect, then your painter and decorator does the bits with no tiles!

this is how it happens on the site i work on anyway!
 
if domestic, rip out old one bang in new toilet using long flexi water inlet and long flexi pan connector, so cust can use it and tiler can tile behind it. then site bath at correct height for panel, level it off and screw it down. then tiler can tile down to bath. when all tiling done throw in the basin and fix bog correctly.

if floor is being tiled too ........well good luck with the bath height and panel.

KJ
 
Doing one now , we always tile floor first (dont grout until end) then set height of bath to panel. If you do it all it makes it so much easier
 
It is much easer to do the floor first. I keep a bit of vinyl flooring offcut to cover mine over and keep it clean. Nothing worse than getting the height wrong for a bath panel
 
Covering bathroom floors ......... wallpaper lining paper cheap as chips and looks very proffesional
 
I try and paint first (especially ceiling) when room is empty as then you don't have to cover everything to protect against splashes. Otherwise timetable/order much as above.
 
Status
Not open for further replies.

Reply to bathroom sequence in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi all, Having a new bathroom fitted this week and looking for advice on how far we should go with waterproofing it. The bathroom will be tiled...
Replies
17
Views
4K
H
  • Locked
I’m a reasonably experienced DIY guy, nearing the end of a complete bathroom refit including install of new shower, velux window, full tile etc...
Replies
7
Views
1K
Radioman
R
I
  • Locked
Hi Black water tank keeps filling up and water comes out the overflow from outside. It is coming in from the bottom pipe which is the outlet pipe...
Replies
7
Views
3K
illumini
I
A
  • Locked
Hi Folks, Finally bought the house and get the keys on the 12th November! My job is as follows Complete install of bathroom, I haven't bought...
Replies
1
Views
1K
ManchesterGas
M
M
  • Locked
Hi All, Just looking for a couple of pointers with regards to a coupe of technical issues / timings. In a couple of months time I'll be starting...
Replies
15
Views
3K
MattWeth
M
Back
Top