H
Heating-eng
Fitting another tomorrow.
Discuss Baxi Neta Tec - anyone fitted one yet? in the Plumbing Jobs | The Job-board area at PlumbersForums.net
They seemed to have changed the blow off design on the netatecs already. It's now on the left.
Yep I agree, does not look good. Also the front panel doesn't fit very well and could do with been better quality, really bad on duotec.wish they would put the pressure gauge on the front its stupid under the boiler same place as the old puma
Yep I agree, does not look good. Also the front panel doesn't fit very well and could do with been better quality, really bad on duotec.
Not sure, I fitted a 40 kw duotec the other day , it was about ÂŁ900 I think.is there a big difference in price between the duotec2 and netatec on say a 28kw?
cheap and built by baxi.
I read the instruction and follow what the rep told me, maybe I have been lucky but I think these are a really good boiler.out of fifthteeen fitted twelve have had various problems, inlet test point is really hard to get to, washers pack are slighty oversized so really difficult to fit when fitted to minium height to surface, gas valve problems diverter problems won't waste anymore time on them anymore!
What problem did you have.have fitted one and had problems with it,customer supplyed boiler because of 5 year waranty baxi wont honour that now because i didnt register with works first there was nothing supplyed with the boiler to tel me this . do me and the customer feel like weve had our pants pulled down =yes . these boilers and baxi support are crap,worster all the way for me.
In my opinion most of the problems are the engineers fault for not reading the instructions.couldnt get it out of chimney sweep mode press the 2 buttons and display kept going back to 303 80, after spending about 50 mins on the phone to baxi and doing a re commition they said as it was working they would be round to look a week later, before week was up the customer had to phone them because heating hadnt come on they left him with no paperwork so dont know what was wrong.
Whats with the self commissioning?
Thanks in advance....
Ring me Sunday if you like. Really easy to fit. No it doesn't say about running hot tap but I was told too do it by the rep before I fitted any. I have now fitted about 10 or so now with no problems at all.Thanks for the reply mate.
When are you available to talk. As i am not fitting until Sunday. Just downloaded the installation instructions and doesnt seem to bad. Just doesnt mention about running hot type while it is going through sequence.
Thanks for the reply mate.
When are you available to talk. As i am not fitting until Sunday. Just downloaded the installation instructions and doesnt seem to bad. Just doesnt mention about running hot type while it is going through sequence.
You don't really want to put all that muck in new boiler. I would flush it first and then just do hot and cold flush with new boiler in. I would make sure I had filter on return.Will also be added x400 when i have finished install or is it not worth it?
If its all plastic then you are right... Depends on system.. If there are any problems with water quality baxi will void warranty.Changed a rad about 3 months ago and all that came out was a bit of black water, had no slugs in the rad at all... All the pipework in my house is plastic with 10mm ends to rads. Should it require that intense treatment? (not meaning to sound that i am not taking your advice just curious)
If you clean it and fit a filter then you will be fine.... They don't try and get out of things, but they will not cover it if is black sludge....How will i know if the water quality is to there liking? As it must be a easy get our clause for them...
well,the clock has now had to be replaced as it was loosing 5 minutes per week.
on top of that, the error code 133 has emerged once again, 4 weeks after having a new valve fitted due to the same error code. this time however up to now, the boiler is fireing up, after useing the reset button, but it will not fire up automatically from the timer.
this boiler is now only 8 weeks old!!!
i guess it works ok in hot water..yes . On the front of divertor valve there is a wire connection. Pull it off and reconnect.. See if that works.. Thanks.Fitted one of these on monday. All seemed fine accept tonight were i have noticed that it doesn't want to modulate!!! Was modulating when fitted and all week (been observing it) Now in heating it just goes to 80 C cuts of then re-fires at 71 C. Any ideas heating-eng? WOuld have thought a PCB or may be gas valve. Commisioned with no problems.
Fitted 2 last week and again no problems, I haven't had to get baxi out once on about 13/14 boilers . The wire on divertor valve can catch on pull down flap and in turn pulls the wire out a bit, this means that the divertor stays in hot water only.the more i hear about the neta tecs the more i wont fit em,yes the heatmax has just 2 years warranty but lines longer it seems a boiler with many fickle problems (neta tec) but allens doing something right because all his installs work,read the mi,s anyone?
5 year warranty ends at end of month....then you need to pay extra for 5 year warranty.Thanks Allen, just done that and it seems to modulate now. Will keep an eye on it.
All i can say about these, is there are easy to fit, swapped from a bahama 100 and it only took 3 and half hours. Nice compact boiler and gives good flow hot water. Would def recommend to a friend. And good with a 5 year warranty...
Reply to Baxi Neta Tec - anyone fitted one yet? in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.