Upstand is the shape of tray or something isnt it? Something to do with tiles. Definitely need the feet for the fall.
 
I thought up stands were the lip on top to tile in to and legs were riser kits
 
yeah thats what i thought too - upstands were for the tiler to tile onto thereby effecting a watertight seal, and riser kits were legs to rise the tray up inorder to provide access to trap etc
 
yeah thats what i thought too - upstands were for the tiler to tile onto thereby effecting a watertight seal, and riser kits were legs to rise the tray up inorder to provide access to trap etc

Are yes, now I see what you mean I've heard riser kits being called upstand a in the past. In that case I would recommend a tray with upstand to tile down onto. That way it ain't ever going to leak at the bottom seem.
 
Also look what I found whil searching for mains stopcock 20130710_113103.jpg
 
Shall I take it all back to brick and dot and dab or get a plasterer to fix it? Didn't mention to the client the possibility of this happening
 
dot and dabbing is fairly easy and staright forward use 12mm moister resistant everywhere apart from the shower area use a cement board there some can be adhesive on some cant so you may have to batten out a little bit but from reading your posts you are studwalling so that's all ok if you dot and dab using 8x4s I allow 1 bag of drywall addy per 2/3 boards depending on how far out the walls are you will need a solid bead of addy at somepoint behind the board for fire regs I put mine at the top and if you get the nack and get all your dots and the solid bed something like the same depth place the board onto the addy lift up off the floor tight to the celling with a pry bar and wedge then tap into level and squaire I use a 1800 and a 1200 level for dot and dabbing and a framing square from screwfix to ensure my internal corners are true in all ways when dot and dabbing give the walls a quick coat of srb thinned with water about 1 parts srb to 2 parts water and remember if your tilling it the plasterboard can hold more weight in tiles and adhesive unskimmed than it can when fully skimmed so just tank where appropriate and tile the lot hope this helps
 
Status
Not open for further replies.

Reply to what would you recommend in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi all, Would welcome your thoughts on this. I'm installing a low level shower tray, over a timber floor. Cast iron soil stack only about a...
Replies
11
Views
2K
Hello all, We have a small bathroom, which currently has the toilet on the outside wall, and the sink on the inside wall. What are the...
Replies
6
Views
2K
Hello all, I am hoping that you can give us some advice. We're in the UK, and have contracted a company to completely refit the first floor...
Replies
9
Views
1K
First - an apology for monopolising the forum with all my plumbing questions! I'm hoping this will be my last and I'll move onto something else...
Replies
8
Views
2K
Hello All and thanks Lou i did write a reply but it would not let me send it? i am not sure what I am meant to write and I do not want to come...
Replies
1
Views
846

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock