Search the forum,

Discuss Single Zone UFH Help in bathroom, so many questions in the Plumbing Zone area at PlumbersForums.net

Messages
6
Done a fair bit of reading and spoke to numerous plumbers/heating engineers and I get so many different answers to my question. By nature I'm a pretty inquisitive bloke and like to know how things work and if its the best way to do things. So my first question is does a single zone UFH setup need 2 port zone valves adding for both the new UFH and the existing radiators or can you just run the existing radiator runs into an UFH pump/manifold? Or do you even need a pump at the manifold, why not just stick the existing flow in one end and the return in the other so it works with the radiators? Obviously if you want to run them on two dif stats you need the 2 port zone valves but just curious as to the reasons why the other options arnt viable. Oh and I have a vaillant ecotec plus 832 combi.

My second question is where to put the underfloor heating. This is for an upstairs bathroom with a timber floor. I've seem people Celotex between the joists, run the piping then screed between the joists. I've also see people use some aluminium plates you fix between the joists then board over. Then I've see this TileFix 18 that sits on top of the floorboard that has runs in for the pipes and you tile straight to it. I would be using moisture resistant chipboard and Id be adding noggins too to make it solid and have as little deflection as possible. I guess the TileFix then acts as a decoupler if you use that. If I opted for the pipes been run under the chipboard using the aluminium plates (don't like the idea of screed) I would prob go for a 6mm hardiebacker over the chipboard before tiling. But will the heat still make its way through 18mm for chip, 6mm or cement board, adhesive and tile?

Thanks
 
Yes needs to be separate eg s plan with the rads 2x 2 ports

Yes you need a manifold and pump else the high temp will damage the floor / tiles

I would infill the joists with insulation then fix 2x2 to the sides of the joists 18mm lower than the top of them then fix 18mm ply to the 2x2 so everything is level with the top of the existing timbers (if the existing timbers arnt level you can adjust at your 2x2 fixing stage )

Then overboard with ufh panel that you can tile straight over
 
Thanks for the knowledge. So the main reason for having the UFH on a separate stat is because having the same heat running through the floor as the radiator would be just too high? Makes sense, I wouldn't fancy standing on a radiator on full whack.

Oh, infill the joists the ply on 2x2 battens? That's one method I've not come across. I guess doing it this way though I'd run into issues when fitting the 22mm deep shower tray which would need tiling over. But I believe they do a 22mm version of the TileFix. I just wonder if it would be solid enough 🤷‍♂️
 
Or you could 3mm ply under the tilefix board first eg sheet the whole floor except the shower area then a thin skim of self lever over the tile fix board to encase the tubes and bring you to your final height eg level with the shower tray ready for tiling

Or put the tilefix ufh boards down and do a 4mm self leveller over the floor
 
And is the floor solid enough with inlaying the ply between the joists on 2x2s? I guess its a good way of keeping the height down and getting them pipes directly under the tiles, just last thing I want is cracked tiles and cracked grout.
 
Yes also this will stiffen the floor up loads and at the time if you want to add a single or two mid span braces you can
 
This is good to know thanks :) Would you fix the TileFix board down too or leave it sat on the timber so it can be free to contract and expand without effecting anything?

Thanks again for sharing, really do appreciate it.
 
Manufacturers instructions some require glue some screws

I would always glue and screw your framing and ply
 

Reply to Single Zone UFH Help in bathroom, so many questions in the Plumbing Zone area at PlumbersForums.net

Similar plumbing topics

Hello all, I'm would like to extend an existing outside tap to another point in the garden. I'm about to pour a concrete patio and was hoping to run the water line underneath. There are existing drain (and who knows what) pipes running along the same wall so I'm nervous about digging too far...
Replies
6
Views
263
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
220
Hello I am looking to install a slimline dishwasher (integrated) into a cupboard in my kitchen. The depth of the dishwasher is 550mm and the depth of my cupboard is larger than this. The issue, however, is that the waste pipe which leads from the sink (next door cupboard) comes out quite a...
Replies
22
Views
497
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
5
Views
522
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two hole mixer but the cold water pressure is high mains fed and the hot is low pressure immersion tank fed. I've been trying to find info on what I...
Replies
2
Views
177
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock