Search the forum,

Discuss Unused UFH port........... in the Plumbing Jobs | The Job-board area at PlumbersForums.net

plumbbobshan

Gas Engineer
Messages
79
Afternoon Lads and Lasses. I am setting up a 2 circuit UFH system the manifold has 3 ports. Do I blank off the spare ports or do I fit a loop and leave it turned off ? The other ports will be controlled with room stats.
 
Blank off or run something else off it eg summer towel rads
 

Reply to Unused UFH port........... in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the...
Replies
5
Views
306
Fitted unvented hotwater cylinder building control looking forms signed it off job was in england i am qualified northern ireland send out a form...
Replies
4
Views
226
Hello, I am seeking some advice, I have a POTTERTON PROMAX 28 COMBI Boiler and I noticed yesterday that the water around the house is no longer...
Replies
4
Views
276
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
526
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16...
Replies
0
Views
221
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock