The new pipes to the towel rail should have been kept vertical and then 2 square bends and with a kick out to bring them in line with the valves.
Still would look an add on, though.
The pipes in the attic should have been installed further away behind the roof frames so to keep the floor space free. The runs that go parallel with the joists can normally be run below the floor, between flooring and ceiling, before being bent up behind roof frames.
It all seems a fairly neat, but done by a beginner, looking install.