Search the forum,

Discuss Replacing shower with bath? in the UK Plumbing Forum | Plumbing Advice area at PlumbersForums.net

Messages
41
I’m looking to replace this shower tray for a bath with the front of it facing the right side of the picture. What do I need so the bath waste goes into where the shower trays waste currently is now?
8F1C6CD9-B15A-406D-A425-B7D27794EA75.jpeg
 
Rip the tray out and you’ll see what’s there.
Just a case of connecting the bath trap to the old pipework from the shower, probably need a short length of pipe and a couple of bends.
At least the existing waste is nice and low so no problem.
 
Rip the tray out and you’ll see what’s there.
Just a case of connecting the bath trap to the old pipework from the shower, probably need a short length of pipe and a couple of bends.
At least the existing waste is nice and low so no problem.
When removing the tray is there anything that I have to do with the waste before or do I just go in & rip the tray out?
 
Unscrew the waste fitting from inside the tray first. If you can’t, break the test around it with a hammer - the idea is to disconnect the tray from the pipework so that you don’t damage/loosen the waste pipe at this stage. Leave that until you can see what’s there.
 
Unscrew the waste fitting from inside the tray first. If you can’t, break the test around it with a hammer - the idea is to disconnect the tray from the pipework so that you don’t damage/loosen the waste pipe at this stage. Leave that until you can see what’s there.
Ok will give that a go. Just going back to when installing the pipework for the bath am I right in installing the bath waste/overflow then I attach the trap underneath to that then from there I will be attaching a pipe to that?
 
I meant, attach the trap to waste then cut pipes to length and use elbow/45 fittings as required to get you back to the existing pipework.
Mark all the pipe/fittings connections so that you can line it up exactly the same again.
Then disassemble everything and glue up the joints, lining up your marks, starting from the existing pipe and ending at the trap.
The trap/ waste is then the final connection.
 
I meant, attach the trap to waste then cut pipes to length and use elbow/45 fittings as required to get you back to the existing pipework.
Mark all the pipe/fittings connections so that you can line it up exactly the same again.
Then disassemble everything and glue up the joints, lining up your marks, starting from the existing pipe and ending at the trap.
The trap/ waste is then the final connection.
Ok I see what you mean. Would you know if my trap which is McAlpine will fit with the waste pipe which is FloPlast as I've seen some brands have issues when trying to fit together?
 
Yes it’ll fit fine, mcalpine traps are best and compression fittings cover a range of sizes so will work with any manufacturer 1 1/2” pipe (40mm 43mm etc etc)
 
Yes it’ll fit fine, mcalpine traps are best and compression fittings cover a range of sizes so will work with any manufacturer 1 1/2” pipe (40mm 43mm etc etc)
Ok so I’ve ripped the tray out & this is how the pipework is underneath. Obviously I will unscrew that shower waste off but what should I attach from that for the bath?
5DF019CD-AFA6-4F7F-B9C0-351AD314813D.jpeg
 

Reply to Replacing shower with bath? in the UK Plumbing Forum | Plumbing Advice area at PlumbersForums.net

Similar plumbing topics

Just started gound work on self build bungalow and wondering best way to do below ground soil pipes. For toilet I was going to go straight down through slab and out through deadwork into a manhole. I will work out falls from manhole and set the height of the waste water system as required. For...
Replies
2
Views
148
The left rear floor corner is highest (the shower pan touches/sits on the floor), sloping down diagonally to the front right corner (lowest). The front right corner shim is 5/8", the left front corner is 3/8" shimmed, with shorter shims under left middle and right rear corner. The pan perimeters...
Replies
6
Views
236
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two hole mixer but the cold water pressure is high mains fed and the hot is low pressure immersion tank fed. I've been trying to find info on what I...
Replies
2
Views
180
Hi all. Hope you have all been keeping well. A while back I decided I only wanted to fit one brand of boiler and decided on Viessmann due to space for servicing and changing parts if ever needing to. I am finding my decision rather hard due to the different clearances on flue runs and cupboards...
Replies
9
Views
261
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m planning to pour a 100mm deep concrete patio on 100mm hardcore. In order to achieve the same final height to line up with the rest of the patio, I...
Replies
6
Views
287
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock