M
Masood
I'm almost 100% certain there was a thread a little while ago that mentioned the 15lt limit for non-G3 qualified had been done away with, and that ALL pressurised hot water installations had to be done by a G3 qualified person.
I'm also almost sure that the same thread mentioned that the demarcation between unvented and vented had been done away with, and anybody working on stored hot water systems had to be G3 qualified.
Did I dream this? Am I going gaga? If not, please can someone point me towards any documentation outlining these changes?
Ta very much!
I'm also almost sure that the same thread mentioned that the demarcation between unvented and vented had been done away with, and anybody working on stored hot water systems had to be G3 qualified.
Did I dream this? Am I going gaga? If not, please can someone point me towards any documentation outlining these changes?
Ta very much!