P
purplemk2
ecoTEC pro28. I've found the braided loop but it's not attached at one end. I'm guessing it goes to one of the two grey valves, but don't know which. Any clues please?
Discuss Pressure problem in the Plumbing Jobs | The Job-board area at PlumbersForums.net
two valves, might have screwed caps at the end, make sure the filling loop is connected to both ends, then simply open it up, usually a black tap or a flat head screw driver to turn the valve, youl hear the water filling (keep and eye on the pressure gauge) don't let it go into the red part at the top, or try keep it below 1.5 bar if you've got a digital display, dropping pressure is indicating a leak so keep your eyes pealed everywhere
Reply to Pressure problem in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.