Discuss OK for waste to run uphill a short distance? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Yep, shower tray instructions say tray must be installed on bed of sand & cement. I'm 90% sure I didn't see him put down any sand & cement unless he managed to knock some up and install it in the 15-0r-so mins I wasn't looking! But, I can see no sign whatsoever of a sand & cement mix having oozed out beyond the edge of the tray, which I think would be the case if it had been used, right?

I was happy to cut him a little slack with the messed up waste pipes (on the assumption I could get someone else in to fix things from below if absolutely necessary), but not installing a tray correctly and leaving open the possibility of it cracking several months or years down the line and leaving me with a big mess on my hands is making me seriously consider finding someone else to finish the job!

Just how easy will it be to remove it now he's siliconed it into place? Can the silicone be carefully cut away or have I already got a big problem on my hands?
 
Probably the silicone will have glued the tray to the floor enough to prevent you moving it without damaging it.
Hard one to call, but if it is installed level and seem solid with no movement, it might not give trouble. Risk is yours though.
 
Probably the silicone will have glued the tray to the floor enough to prevent you moving it without damaging it.
Hard one to call, but if it is installed level and seem solid with no movement, it might not give trouble. Risk is yours though.

Hmm... tricky. It's sat on a new piece of OSB flooring, so pretty level, but do I want to take the risk when the installation instructions say it must be installed STRICTLY in accordance with them? If I go down the route of removing it and it gets damaged, couldn't I deduct the cost of a replacement from what I pay him, since it would have been directly due to his negligence?

Talking of which, how do plumbers and clients generally agree on an amount to be paid when work is cut short in cases when the quote is for the whole job? Any advice?
 
Osb ? really tbh should be 18 marine ply

And work - anything bad / having to be re done which is most of it in my opinion:D
 
We agreed on marine ply when he quoted me... and it got mentioned again in an email. Then the day he started the job he talked about using chipboard! I talked him out of that and we ended up with OSB, which I thought was as strong as ply and therefore this didn't concern me too much. What are the main reasons for using marine ply over OSB? (i.e. should I be considering having the flooring changed over?)
 
We agreed on marine ply when he quoted me... and it got mentioned again in an email. Then the day he started the job he talked about using chipboard! I talked him out of that and we ended up with OSB, which I thought was as strong as ply and therefore this didn't concern me too much. What are the main reasons for using marine ply over OSB? (i.e. should I be considering having the flooring changed over?)

If it's gets wet for any reason it goes to mush and fails

That's mainly why we install cylinders or tanks on ply bases
 
If it's gets wet for any reason it goes to mush and fails

That's mainly why we install cylinders or tanks on ply bases

OSB goes to mush as well? I know that happens with chipboard, but didn't know about OSB. So, if I have the tray redone, would you suggest replacing with marine ply? Or is that more of a belts & braces approach and OSB is just about ok?
 
OSB goes to mush as well? I know that happens with chipboard, but didn't know about OSB. So, if I have the tray redone, would you suggest replacing with marine ply? Or is that more of a belts & braces approach and OSB is just about ok?

Well I would but will only go to mush if it's wet so thinking like that just make sure all your seals are good and mastics are good quality and are re sealed pre actively you should be fine
 
What else should I be on the lookout for?

Hopefully all the hot & cold feeds are ok, as the room has now been plastered (no concerns there, though, as we used our own plasterer who has done an excellent job - put up a new suspended ceiling to make sure it's dead level, built out a wall so bath isn't sat in a corner which isn't a right angle etc.).
 
Atm nothing should be just second fix if your happy ish atm
 
New posts
Status
Not open for further replies.

Reply to OK for waste to run uphill a short distance? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Just started gound work on self build bungalow and wondering best way to do below ground soil pipes. For toilet I was going to go straight down...
Replies
2
Views
171
S
Hi, I seemed to have a blockage in kitchen sink. A plumber came and cleared all the pipework that is visible inside my home (there was debris and...
Replies
2
Views
160
Sonya K
S
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two...
Replies
2
Views
220
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16...
Replies
0
Views
238
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m...
Replies
6
Views
319

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock