Discuss method statements and risk assessments in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
M

mark_mc

lads.

i starting to subcontract plumbing and heating work and require method statements and risk assessments

could you send me any information or examples you have to my email address [email protected]
thanks for the help guys
 
Good luck getting that info for free.
I had to pay to get it!
 
i have a health and safety manager doing them for me now along with health and safety poilicies etc but not for free.
in this world nothing is free lol.
 
there is templates online somewhere, my in-law supposed to send me a link but he's a waste of space!.
 
Status
Not open for further replies.

Reply to method statements and risk assessments in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hello, I am looking for a heating engineer to diagnose and resolve an issue with my Vaillant EcoTec 832 combi boiler. Job Location: Copeland Rd...
Replies
1
Views
430
Hullo everyone its a while since I posted on here basically because i have had no plumbing issues however I have one now. My son recently moved...
Replies
3
Views
365
  • Solved
Hi, I am looking for a bit of advice. Our Gledhill hot water tank was installed incorrectly 18 months ago and has been sending bubbling hot...
Replies
2
Views
533
I'm looking for a career change, currently working as a Mechanical Design engineer and have done so for the past 10 years, I'm now 27 years old...
Replies
0
Views
358
My name is Chanel i’m 19 years old i’ve just finished my level 2 plumbing course and i’m looking for an apprenticeship or someone who could take...
Replies
0
Views
610
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock