Discuss method statements and risk assessments in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
M

mark_mc

lads.

i starting to subcontract plumbing and heating work and require method statements and risk assessments

could you send me any information or examples you have to my email address [email protected]
thanks for the help guys
 
Good luck getting that info for free.
I had to pay to get it!
 
i have a health and safety manager doing them for me now along with health and safety poilicies etc but not for free.
in this world nothing is free lol.
 
there is templates online somewhere, my in-law supposed to send me a link but he's a waste of space!.
 
Status
Not open for further replies.

Reply to method statements and risk assessments in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi guys. I'm trying to identify a toilet model before ordering a seat for a customer. I went to what used to be a Roca stockist (they no longer...
Replies
2
Views
193
Hi, My current hot water system needs to be replaced. Anyone got any suggestions or can recommend any plumbers around Derrimut area that won't...
Replies
6
Views
386
P
  • Question
Boiler is SIRIUS THREE FS 70 Potterton commercial. Situation: We are small building contractors and my labourers managed to damage the radiator...
Replies
2
Views
153
B
  • Locked
Hi All, I am a 16 year old school leaver (Sept 23) looking for a local company to take me on as an apprentice plumber. I live in Benfleet and am...
Replies
0
Views
114
Billy Barnard
B
I am in process of replacing an existing sink with a new stainless steel one. The existing tap is plumbed directly to copper which means that it...
Replies
6
Views
340
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock