Discuss Indirect Unvented cylinder, Combi Boiler and Nest Thermostat in the Plumbing Jobs | The Job-board area at PlumbersForums.net
No idea what world you live in though mate.Please re read what put. Seeing it loads off times does not meant it's OK, this is why I did say get a drawing.
And , s plan zones don't require temp and pressure relief of or a temp cut off do they? So not the same .
Think we have to just disagree on this one @ShaunCorbs @Bibbs118. I trust what Vaillant told me and that’s that.
If the manufacture say it is ok. And they warrant the job for 10 years then it is ok. But for future reference I will make sure they email me confirmation. On that not I’m done. I will not be commenting again.Being told something is not the same has following the MIs, what am saying is, if you can't get a drawing then it's not ok .
Because it's impossible to follow MIs without having the MIs .
If the manufacture say it is ok. And they warrant the job for 10 years then it is ok. But for future reference I will make sure they email me confirmation. On that not I’m done. I will not be commenting again.
I was being sarcastic. But honestly I’m done nowThat's totally correct, you need confirmation.
Re read what I wrote.
I have done this with a worcester engineer employed by worcester.
It is acceptable.
I was being sarcastic. But honestly I’m done now
Can worcester authorise one of their own products ?
Of course they can .
A worcester was fitted on such set up and fitted and authorised along with guarantee themselves.
Job done money in the bank and all happy
Reply to Indirect Unvented cylinder, Combi Boiler and Nest Thermostat in the Plumbing Jobs | The Job-board area at PlumbersForums.net