The boiler is installed, it just needs commissioning, I suppose when there are no faults because if there are then it is the same as asking how long is a piece of string?

The boiler is an Ideal Logic Max c35Kw, if that makes any difference.

Cheers
 
give us a bit more ! , why didnt the installer commission it ?
Sure - I posed the question badly....
What I meant is how long does it take to undertake the Benchmark Commissioning Checklist? If that is a daft question, them my apologies.

I want to know because the boss called me at 16:15 and said that the boiler would be up and running later that same day, but looking at thephotos, it seems that there was still quite a lot of work to do, including the commissioning. Safe to say, that the job ran over.

Actually, I can upload some photos, the first is what it looked like at 17:51 on the day of the install (some way off a finished job) and the remaining ones are what it looked like post commissioning on-hand over to the customer, bar the last one is what it looked like once they had returned and sealed the internal seal.- - following an AT RISK notice issued by the manufacturer.

And yes, the original flue terminal exit, was left open and exposed to the elements (it was the 24-25th January).
 

Attachments

  • 007 Flue Installation In-Progress.jpg
    007 Flue Installation In-Progress.jpg
    157.8 KB · Views: 26
  • 1-Hometeam Installation of Flue taken 2019 06 15 (7).jpg
    1-Hometeam Installation of Flue taken 2019 06 15 (7).jpg
    178.9 KB · Views: 26
  • 1-IMG_20220427_170034.jpg
    1-IMG_20220427_170034.jpg
    218.3 KB · Views: 23
  • Hometeam Installation of Flue taken 2019 06 15 (2).jpg
    Hometeam Installation of Flue taken 2019 06 15 (2).jpg
    185.2 KB · Views: 23
  • IMG_20220427_170011.jpg
    IMG_20220427_170011.jpg
    266.8 KB · Views: 25
  • 1-IMG_20220427_170533.jpg
    1-IMG_20220427_170533.jpg
    217.2 KB · Views: 26
I normally allow for an afternoon for completing / filling in the paperwork , commissioning and filling / making good
 
They should make good the old flue hole, at least temporarily block it up until they can.

Didn't you say this was a listed building? I must say all that flue hanging in a residential won't and doesn't look great.
 

Reply to How long does it take to Commission a new boiler in the Gas Engineers Forum area at PlumbersForums.net

Similar plumbing topics

I have an ideal vogue max S18 boiler and I’m considering fitting auto balancing TRVs, my question relates to the boilers pump. I see a boiler...
Replies
1
Views
173
We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the...
Replies
5
Views
307
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
531
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two...
Replies
2
Views
184
Hello all, I'm would like to extend an existing outside tap to another point in the garden. I'm about to pour a concrete patio and was hoping to...
Replies
6
Views
264
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock