wow, it is much more than I expected.
I am thinking about adding the radiators to the existing boiler and connect the new shower downstairs (it will be rarely used). Then complete the refurbishment plastering walls, laying new floors, etc.
How difficult would it be in a few years time to replace it with a combi? Would it be very destructive, lifting floors, making holes in the walls...?
I am thinking about adding the radiators to the existing boiler and connect the new shower downstairs (it will be rarely used). Then complete the refurbishment plastering walls, laying new floors, etc.
How difficult would it be in a few years time to replace it with a combi? Would it be very destructive, lifting floors, making holes in the walls...?
Last edited: