jase158

Hi i have a customer who is a bit wary of handing the deposit to tiler and electrician, I think she wants me to take responsibility of the deposit,

My question is....

Is there any way of covering myself of the deposit, i.e. if the tiler or electrician take the money and do not do the work.

Is this covered in insurance or is there any companies out there who will cover it?
 
I would say if the customer is wary of giving a deposit,she must be wary of them doing the work also,so maybe she should look for someone else to do the works that she feels more comfortable with,however also if she pays the deposit by credit card she would be covered

imho
 
excellent point, me i suppose, although i couldn't of done it without them.
 
but then i would never be doing big jobs?

I can not tile a complete bathroom or electric under floor heating, I think that it is a shame we can not trust each other.

Isn't it our job as project manager to take control of monies, other trades i.e.
 
I use a tiler the same as you to do full bathrooms as he is very good. Before i even start the job i will get a big deposit to cover my materials and most of the tiling work. I have had to pay the tiler before sometimes. I think its a case of do you trust the customer to pay you and also they should trust you and your judgement on other professionals you employ. Just make sure you cover your overheads before you start if possible. If not be 100% sure you trust the customer. In the end if youve all done a good job there shouldnt be a problem.
 
I use a tiler the same as you to do full bathrooms as he is very good. Before i even start the job i will get a big deposit to cover my materials and most of the tiling work. I have had to pay the tiler before sometimes. I think its a case of do you trust the customer to pay you and also they should trust you and your judgement on other professionals you employ. Just make sure you cover your overheads before you start if possible. If not be 100% sure you trust the customer. In the end if youve all done a good job there shouldnt be a problem.

I trust the customer 100% and i trust the electrician 100%, just a bit nervous of the tiler, spoke to the customer and they recommended doing it in 2 parts, so the deposit for the first half is paid and once this is complete we can get paid for that bit along with a deposit for the next part,

this is a bit difficult as buying in bulk is normally cheaper, although i suppose it isn't too bad, gives her the option of not going ahead with the second part should things go wrong I suppose.

Also the first part is 1 bathroom, the second part is another bathroom, so 2 bathrooms in total
 
Don't do deposits, if it's a big or long job then I organise staged payments before starting. Have a good electrician and plasterer who get paid when I get paid, or who invoice customer direct depending on type or size of job.

As people have said its all matter of trust, but I try not to get involved with finances for others.
 
Don't do deposits, if it's a big or long job then I organise staged payments before starting. Have a good electrician and plasterer who get paid when I get paid, or who invoice customer direct depending on type or size of job.

As people have said its all matter of trust, but I try not to get involved with finances for others.

thats what i wanted to do, get them to invoice customer direct, however, this all went wrong as the tiler i used to use stopped answering the phone, now customer is a bit wary, i think
 
Its all down to your gut feeling then, which from your posts above, your not happy with it. An executive decision is required. Good Luck
 
well i am meeting on thursday with everybody involved and will get them to write some sort of letter of intent/ contract, i.e. at least that way i am covered on paper. Then give the deposit money a couple days before start of work, less time for things to go wrong. just be careful, hopefully the start of a great partnership between me, the tiler and electrician, its a shame when things go wrong.
 
Status
Not open for further replies.

Reply to Deposits to cover materials in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hello all, I'm would like to extend an existing outside tap to another point in the garden. I'm about to pour a concrete patio and was hoping to run the water line underneath. There are existing drain (and who knows what) pipes running along the same wall so I'm nervous about digging too far...
Replies
6
Views
263
Hi guys. I'm trying to identify a toilet model before ordering a seat for a customer. I went to what used to be a Roca stockist (they no longer are) and one of the guys there reckoned it might be "The Gap". I went to the new stockist and the guy there disagreed it was "The Gap" and that he'd...
Replies
2
Views
163
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
5
Views
523
Hi all I'm hoping someone can shine a light on this for me Since our stop tap on the pavement has now been filled with sand for whatever reason, we are relying on our property fitted stopcock (this is outside on our garage wall) Unfortunately turning this to the closed position only reduces...
Replies
3
Views
301
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
221
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock