Discuss ContractorForum: nvq 3 had enough: is there any way i can do this course without havi in the Plumbing Jobs | The Job-board area at PlumbersForums.net
- Status
-
Not open for further replies.
Administrator
Staff member
Admin
- Status
-
Not open for further replies.
Reply to ContractorForum: nvq 3 had enough: is there any way i can do this course without havi in the Plumbing Jobs | The Job-board area at PlumbersForums.net
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16...
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking?
This originally happened about 12 months ago and has happened 3-4...
The fittings below are for a mixer bar attached to a self contained shower. i.e not a wall. The attaching screws have snapped. I could get two new...
Ideal Logic 24, Previous problem was that the hot water was only cold or barely warm if the heating was in use. If heating was off and boiler cold...
Hi. I need a new toilet supply line but don’t know the size type of the fitting at the shut off valve. It is not 3/8 compression. It is a plastic...