so what you got to do now, whos paying?
2 couplings, 2 foot of pipe, 400 quid...
ufh? you happy with joints under the screed then?
what if problems after time?
I only give a tailgate guarantee.
the door has a 12" threshold. Also they wanted to recess them in to match the next door property, so they have cut back 6"!Why did they break through the screed in the first place?
the door has a 12" threshold. Also they wanted to recess them in to match the next door property, so they have cut back 6"!
its not the end of the world, but would have been nice to have been told.
It's about 50mm all over But as the visqueen bends up the walls, it's always a bit thinner at the edges. It's going to be an opticians and getting tiled. Looks like they are going to gave to wait until this drys out!Screed looks thin!