Discuss Advise on a NEW indirect unvented hot cylinder in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Vaillant uniSTORE for me as well as Vaillant System boiler. I wouldn’t want to mix the brands though but that’s down to budget and preference.

Where are you based on london
 
Personally I wouldn't fit mega flo. You're not getting anything extra for the extra money.

All your estimates from g3 qualified people?

Hi Simon,
Those are exactly my thoughts, I'd usually go for a top of the range, but in this case, it seems that it's not worth 40%-50% more.
Yes, all the plumbers that came and quoted are G3 qualified. I know you need a G3 certificate to work with pressurised systems, so I'd expect them to leave a certificate after install, as otherwise it doesn't pass inspection and will cause issues when it comes to selling the house.
 
Interesting poll results, thank you everyone for contributing!
So nobody here, would even consider Telford :D
Interesting... Glad I've asked now.
 
Hi Simon,
Those are exactly my thoughts, I'd usually go for a top of the range, but in this case, it seems that it's not worth 40%-50% more.
Yes, all the plumbers that came and quoted are G3 qualified. I know you need a G3 certificate to work with pressurised systems, so I'd expect them to leave a certificate after install, as otherwise it doesn't pass inspection and will cause issues when it comes to selling the house.
Building control certificate takes 4-6 weeks!
 
Hi Simon,
Those are exactly my thoughts, I'd usually go for a top of the range, but in this case, it seems that it's not worth 40%-50% more.
Yes, all the plumbers that came and quoted are G3 qualified. I know you need a G3 certificate to work with pressurised systems, so I'd expect them to leave a certificate after install, as otherwise it doesn't pass inspection and will cause issues when it comes to selling the house.
Building control certificate takes 4-6 weeks! Benchmark certificate should be completed on completion
 
Building control certificate takes 4-6 weeks! Benchmark certificate should be completed on completion

Thanks for heads up Jase. I will ask for benchmark certificate on completion. Do I need to get building control certificate after the job is complete or just before selling the house?
 

Reply to Advise on a NEW indirect unvented hot cylinder in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

  • Question
Hello, I am fitting new taps and a shower mixer in my en-suite and was looking to isolate the hot water pipes. I have an unvented indirect...
Replies
2
Views
651
Hi, I'm looking to purchase a 300L unvented indirect cylinder to work with a standard heat only boiler. I may have solar panels in the future...
Replies
9
Views
690
Hi all, I have an OSO Direct 210 hit water cylinder installed in my home, with 2 switches (on/off; and boost). The boiler is for hot water only...
Replies
6
Views
510
Hi all. As the title says, I have a problem with an unvented cylinder I had installed last year where the first time I turn a hot tap on after the...
Replies
27
Views
2K
Hi All, looking for some advice. I have ARISTON CLASSICO UNVENTED INDIRECT CYLINDER ST1 210 which has corroded at one of the main inlets and is...
Replies
0
Views
845
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock