Discuss Passable work or bodge job!? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Just to point out here that I assumed the whole installation was by your plumber. If I was wrong I apologise.

If you require them to reconfigure existing pipework then you will, rightly, incur additional cost. That said, it should not be unreasonable and you will have a better safer installation as a consequence.
 
Just to point out here that I assumed the whole installation was by your plumber. If I was wrong I apologise.

If you require them to reconfigure existing pipework then you will, rightly, incur additional cost. That said, it should not be unreasonable and you will have a better safer installation as a consequence.
Basically the bathroom and kitchen was first installed by different fitters and was a total bodge job. This guy has been sent to rectify and reinstall everything. The new Speedfit plastic pipe work wasn't done by this guy, he chased the radiator pipes into the wall and joined them to the existing pipes laid by the first fitters. Originally the cold water feed came straight in on plastic pipe in an arc, kinda 40 degrees or so and dropped under the floorboards, and just plastered over!

I do feel sorry for him as I'm braking his balls over everything given the first installation was a nightmare.
 
If he’s there to rectify then he will understand where you are coming from. Jut lots of “I know it’s not your fault but...” and tea goes a long way.
All a bit frosty at the moment but not a total breakdown. We're all a bit stressed for obvious reasons. Them because they're picking up someone else's Rubbish and me because I have to make sure it's all done right this time. Thanks for all the replies and advice.
 
It might be worth a chat to explain what you expect and what they are doing. If they are a new company correcting someone else’s mess they should be cut a bit of slack to be fair.
My thinking too, hence why I didn't go back and tell him to change the radiator flow and return pipes which curve. I reckon they'll be ok as the water pressure won't be as much as the hot/cold feeds to the shower. May come back and haunt me I know!
 
Are you on a sealed system?? Also as the pipes heat and cool they expand and contract this is equally disturbing to the o rings as the pipes will move. Albeit fractionally but it still moves
 

Reply to Passable work or bodge job!? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

    • Like
  • Locked
Hi what's the best advice in dealing with a leak in a customers house? 1. Stripped out bathroom suite, installed 1st fix shower pipes in stud...
Replies
79
Views
9K
A number of issues have been raised from a boiler replacement. Boiler not operating and with no pressure. Tile damage Sprawling pipe layout in...
Replies
21
Views
5K
K
  • Locked
Hi, I'm new, I've got a plumber doing some renovations for me and I'm not sure whether what he's doing is correct/appropriate. It's a 1930s end...
Replies
19
Views
2K
  • Locked
Hello everyone. This is my first post on here so please excuse if I'm not au fait with the procedure - I'm not even sure if I'm posting in the...
Replies
11
Views
1K
  • Locked
:( So, the lad I've got through his NVQ 2 and has had his own van for a year or so now. Got back from my electrical assessment today and walked...
Replies
35
Views
521
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock