Three hours to fit an outside tap on a new build this morning, I had a nightmare!
Hardly any space between fittings and the shelf wouldn’t come out. Tightening up the isolation valve and the two soldered tees straight after the stop tap came apart. They were butted together and no solder inside either fitting! Just the lip of either tee.
Easiest £60 I ever made 😅
View attachment 44425
Ugh, I feel for you. I have been there many of times.
 
It should still be a set standard though mate. I want to know who signs this stuff off before the plasterboard goes up and is skimmed.

I agree but it seems nobody gives a monkey's.

Took a bath out of a new build to put a shower in, bloody thing fell out. Water stains on plasterboard under bath from it leaking. It was only 6 months old.
 
I agree but it seems nobody gives a monkey's.

Took a bath out of a new build to put a shower in, bloody thing fell out. Water stains on plasterboard under bath from it leaking. It was only 6 months old.
I see it all the time mate. My estate is a new build and there is loads of others by where I live.
 
Floor and wall tiling completed WC unit fitted temporarily so they have a toilet to use , vanity unit and ceramic sink top to install tomorrow . Kop
 

Attachments

  • IMG_20200702_174628.jpg
    IMG_20200702_174628.jpg
    82.9 KB · Views: 17
  • IMG_20200702_174616.jpg
    IMG_20200702_174616.jpg
    107.2 KB · Views: 15
Lights and fan done today i got the towel rail fitted shower doors installed and sealed up all ready to use. Kop
 

Attachments

  • IMG_20200703_175012.jpg
    IMG_20200703_175012.jpg
    117.1 KB · Views: 15
  • IMG_20200703_175026.jpg
    IMG_20200703_175026.jpg
    91.8 KB · Views: 15
Nothing as nice as that today KOP. Revisit a bathroom I did about 8 years ago to change the bath and basin taps.
The shower enclosure has never been used. Extremely low water pressure due to steel supply pipe, was going to be replaced a couple of months after I did the shower. They still haven't got round to doing it.

20200703_105556.jpg20200703_105549.jpg20200703_105532.jpg
 
All in one worktop Mate?
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop
 
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop
Looks good though mate.

I did these on a Friday
 

Attachments

  • 28C21F1D-9447-4938-ABE9-0121CD45E450.jpeg
    28C21F1D-9447-4938-ABE9-0121CD45E450.jpeg
    143.3 KB · Views: 14
  • 659B1263-9C30-4206-B4D4-4F266DB07A14.jpeg
    659B1263-9C30-4206-B4D4-4F266DB07A14.jpeg
    151.2 KB · Views: 14
  • C007FD5C-9BA6-4012-B172-0D5AC7A94FE3.jpeg
    C007FD5C-9BA6-4012-B172-0D5AC7A94FE3.jpeg
    125.9 KB · Views: 16
Yes H it is all in one bud , It came from Victorian plumbing and for the cost it's hard to beat only gripe I had was the internal components of the hideaway cistern which were inferior quality in my opinion I swapped them for fluid master and changed the toilet flush cone, the shower doors were a pain to assemble and needed two of us it had to be done in the bathroom because of the size fitting instructions were next to useless but it got done mate 👍 . Regards kop

I'm finding I'm always changing the guts on toilets before installing when customer supplies. Not worth the hassle of some of the tat you see when you open them up.
It's got to the point now where I just add money on when I do the estimate.
 
Last edited:
Nice job H good to see you back .
Nice H good to see you back bet they will be put to good use next week 😂😂
[automerge]1593962219[/automerge]

Spot on mate turn up on time and no breakages 😄

Thanks mate. Doing more now. But will not be doing as many hours as before lock down. I’m enjoying family time to much if I’m honest.
 
Update chaps job is done and dusted and in use moved on to two kitchen first fixes , and a couple of designer type rads, another shower room to start next week . Regards Kop
 

Attachments

  • IMG_20200707_143928.jpg
    IMG_20200707_143928.jpg
    99.9 KB · Views: 7
  • MVIMG_20200707_143920.jpg
    MVIMG_20200707_143920.jpg
    117.2 KB · Views: 9
  • MVIMG_20200707_143955.jpg
    MVIMG_20200707_143955.jpg
    108.5 KB · Views: 6
Potentially my next job. Oil boiler and unvented cylinder, tie up the underfloor heating, complete first fix for upstairs heating and first fix hot and cold to 3 bathrooms, cloakroom, utility and kitchen.
Then back to complete the bathrooms.

20200708_165426.jpg20200708_165433.jpg20200708_165445.jpg20200708_165455.jpg20200708_165501.jpg20200708_165507.jpg20200708_165523.jpg20200708_165843.jpg20200708_165946.jpg20200708_165951.jpg
 
Ooo damp wall special fixings required who did the wastes ?
 
Customer has done everything upto now.

Nothings been pressure tested, underfloor heating wasnt filled or pressurised at screed going down.

Architect has screwed up left right and centre

Got it all covered in t & c's, labour and consumables only. Invoiced and paid on a friday when I've been there. Just waiting for written confirmation to go ahead.
 
:D good luck be fun if the screed has to come up
 
It will be because that's one of the things the architect screwed up. Hardcore, 4" concrete then underfloor heating in screed. They had to add in an extra inch of wingspan on top of the concrete.

makes you think has he done the footings correctly
 
Need to replace this water heater for a customer he wants a small combi fitted but only use the hot water side for now with rads fitted at a later date , it needs to be rear flued as below and the flue route is challenging , your opinions chaps ??? Valliant pure is looking like it may work ??
 

Attachments

  • IMG_20200710_163628.jpg
    IMG_20200710_163628.jpg
    81.4 KB · Views: 26
  • IMG_20200710_163648.jpg
    IMG_20200710_163648.jpg
    178.4 KB · Views: 25
  • IMG_20200710_163640.jpg
    IMG_20200710_163640.jpg
    126.8 KB · Views: 19
Glow worm energy is a cheaper version.
Not going to help you here but do you know about the vaillant controls extending the warranty?
 
Well looks like I wont be doing the chapel after all, bloke thinks my price for first fix and boiler/cylinder is too expensive. Put in 13 days all on copper. 4 1/2 days for boiler and cylinder room inc controls wiring. 4 days to first fix the three bathrooms. 1 day for kitchen and cloakroom. 1 day to fill and pressure test. 1/2 day for oil line (not an easy run). 1 day to flush refill and commission boiler and a days feck factor.
Never mind.
 
Service the standard thing it’s been serviced every year :D
 

Attachments

  • C9081540-0B79-418A-9624-34E5CEB73C65.jpeg
    C9081540-0B79-418A-9624-34E5CEB73C65.jpeg
    148.7 KB · Views: 17
New posts

Reply to What we all working on this week ? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi guys....we have an old Astracast sink top....I think its a composite sink....has a big single bowl. My wife thinks it looks scruffy....looks ok to me.....sound but the bowl has seen a lot of work. So she wants a new one...Astracast it seems are no more. The problem is its size.....looked...
Replies
2
Views
182
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
386
Hello plumbers in my internet. So the Mrs want a spray mixer tap in the kitchen as we had two separate taps. I changed the tap for a temporary two hole mixer but the cold water pressure is high mains fed and the hot is low pressure immersion tank fed. I've been trying to find info on what I...
Replies
2
Views
171
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
5
Views
506
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock