Discuss Wanting the moon on a stick.... in the Plumbing Jobs | The Job-board area at PlumbersForums.net
impossible to say without seeing the whole job but sean cobs comments about galvanised pipe being unsuitable for hot and cold water is rubbish must co0mmercial and larger buildings will be in iron iff its heating its probably not even galvanised just black
time scale is very tight but if its something that can be prefabbed and fitted with two unions its not impossible two cuts and two threads using a hand held but the picture shows tees on the pipework so very unlikley to be that easy
also the op doesnt say if its heating or water heating could be left drained at this time of year as many are turned of for summer
Reply to Wanting the moon on a stick.... in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.