Hi lads. Having some issues with the wiring of the above boiler. I've run a new live neutral earth to the boiler from the fused spur via the wiring centre. I always thought the pump was switched with the orange on the 3 port. Now the pump live is seperate do I run the pump direct to boilers pump ports ? Also it says in manual the switched live goes into 4. I'm getting quite confused with it. I must admit we haven't wired a heat only boiler for years as we have a spark that does this for us. The old boiler was switched live with no pump overrun
 
Last edited by a moderator:
You need live from the pump to the boiler as well as permanent live. Switch lives goes to 4 in boiler
 
Done the pump live to boiler got it going now going to tackle wiring centre for switched live
 
Wire the pump to the boiler as that will control pump over run
 
Status
Not open for further replies.

Reply to Vaillant ecotec 418 wiring in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the man-door to the boiler room. It's intent is to 'halt' the operation of the boilers in the room should there be an emergency. He is demanding that I do...
Replies
5
Views
280
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
5
Views
496
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
365
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m planning to pour a 100mm deep concrete patio on 100mm hardcore. In order to achieve the same final height to line up with the rest of the patio, I...
Replies
6
Views
262
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock