Discuss TRV's & Boiler+ (Boiler Plus) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Only reccomended on boiler replacement only. New system but keeping existing pipework requires trvs.

Still only recommended table heading

Recommend minimum standards
 

Reply to TRV's & Boiler+ (Boiler Plus) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Would like some help please as my Drayton Wiser system is a mess. I had 2 TRVs in the lounge, one in the main bedroom, the rest of the house - 6...
Replies
3
Views
456
I recently had a new 2023 Vaillant ecoTec plus 630 (30kW) system boiler installed along with a Low Loss Header (LLH) in my house. I have 21 rads...
Replies
10
Views
808
I have a Vaillant eco plus 837, year installed 2008. It works well. We have one large zone for the house with 13 rads running off it. We also...
Replies
1
Views
337
H
Hi. I have all the rads in the house controlled with wireless Honeywell TRVs. This was done by an installer about 2 yrs ago. The kitchen TRVs are...
Replies
3
Views
566
Desperate for some help! Be a life saver of someone can help as suffer from a high intolerance to noise. Moved into new house 1940s (copper...
Replies
7
Views
807
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock