Search the forum,

Discuss Gas safe course registration in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Messages
1
Does anybody know how long the course is in UK for gas safe.thinking about getting gas registered. I'm based in northern Ireland, the course over here takes 3 month
 
Gas Safe Registration is fairly straightforward. To achieve basic registration (boilers and water heaters only) in three months, you would need to be working with a Gas Safe Engineer to build up your portfolio of at least ten supervised jobs. Thereafter, you meed to wait 6 months to add cookers, fires and the three categories of LPG - without having to submit a further portfolio of relevant work.

For the theoretical / practical training it is generally a full time course lasting 5 or 6 weeks.
In conclusion to achieve registration in 3 months would be very good going
 
Jeez, 10 supervised jobs??!!! I had to produce 75 boiler jobs and 35 for fires, cookers etc. I went to college though on day release working with a small plumbing and heating company 4 days a week. I already had my nvq and was told at the end I could have got away with 35 days but college wanted it to be more comprehensive than that.
 
Duncan,

Yes and 5 of the 10 jobs can be in a classroom / simulated environment!

In essence, Gas Safe can now be achieved by only undertaking 5 Landlord Certificates in a true domestic environment.

I will leave you to draw your own conclusions.
 
Ffs, I’m not surprised I struggle with gas sometimes. I was on loan to our subbies and picked up hardly anything, they were on price work, and I think we only needed so many installs, ant remember the figure, but wasn’t half of yours Duncan 😩
 
Duncan,

Yes and 5 of the 10 jobs can be in a classroom / simulated environment!

In essence, Gas Safe can now be achieved by only undertaking 5 Landlord Certificates in a true domestic environment.

I will leave you to draw your own conclusions.


Who’s told you that pal?
 
That is the current pathway for Logic Certification MLP Program DNGA 3 to achieve ACS. The portfolio for boilers is 5 service or landlord certificates and 5 instals.
The instals can be in a simulated environment.

In essence the ACS entry point is:

Evidence that you have basic plumbing knowledge
Classroom theoretical training 3 weeks
Classroom practical training 2 weeks
Write up 10 method statements
Write up and have endorsed 5 service / inspections/ landlord certificates in a real environment. (Portfolio)
Write up and have endorsed 5 installs in a simulated environment. (Portfolio)
Sit the ACS assessment.
Pass and register for Gas Safe.
After 6 months return for 1 week to extend the qualification for cookers and fires ( no further portfolio requirements).

I don’t agree with the above, but it is sadly reality.
 
Last edited:
Ffs, I’m not surprised I struggle with gas sometimes. I was on loan to our subbies and picked up hardly anything, they were on price work, and I think we only needed so many installs, ant remember the figure, but wasn’t half of yours Duncan 😩
I know what you mean, 6 boiler installs was all it took for me then 7 days in the classroom. My first few boiler faults, landlords and services really worried me. I'm alot more confident now but these training centres have alot to answer for.
 

Reply to Gas safe course registration in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

  • Article
A Plumber Who Worked Illegally Gets A Suspended Sentence After Falsely Claiming To Be Gas Safe Registered. A Plumber in Herefordshire was prosecuted after Hereford Trading Standards Team found that he was falsely claiming to be on the Gas Safe Register when he was not, putting members of the...
Replies
0
Views
192
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
5
Views
496
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
208
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock