K
Kyle87
Do you guys prefer to fit baths toilets etc
Straight onto floorboards or do you recommend customer has flooring/tiling first.
I think it looks a lot better if you do first fix, then have floor done then fit toilets etc. trouble is you have to drill through tiles and such like.
What's your preferences?
Straight onto floorboards or do you recommend customer has flooring/tiling first.
I think it looks a lot better if you do first fix, then have floor done then fit toilets etc. trouble is you have to drill through tiles and such like.
What's your preferences?