Search the forum,

Discuss Cistern lever: 3/8" bush means 17mm? in the UK Plumbing Forum | Plumbing Advice area at PlumbersForums.net

Messages
12
I have bought a cistern lever that is described as having 3/8" bush According to the salesperson, the 3/8" refers to the diameter of the large white plastic threaded shaft which passes through the hole in the cistern.

But when I measure the diameter of this large white plastic threaded shaft, it is 17mm. 17mm is NOT 3/8 of an inch! 3/8" is 9mm.

So, what measurement does the 3/8 inch actually refer to?
 
Apparently most cisterns are made for 1/2" bsp thread on the lever, but Ideal Standard use 3/8".
As has been said, the imperial measurements relate to internal bore of the pipe, and the thread o/d's are as below:
if the actual hole in your cistern only measures 3/8" then neither of the standard sizes will fit!

IMG_0405.jpeg
 

Reply to Cistern lever: 3/8" bush means 17mm? in the UK Plumbing Forum | Plumbing Advice area at PlumbersForums.net

Similar plumbing topics

Hi. I need a new toilet supply line but don’t know the size type of the fitting at the shut off valve. It is not 3/8 compression. It is a plastic nut about the same size as the one going into the cistern but has a different thread. Attached is a photo. Can you advise. Thanks.
Replies
2
Views
183
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
323
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
186
We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the man-door to the boiler room. It's intent is to 'halt' the operation of the boilers in the room should there be an emergency. He is demanding that I do...
Replies
5
Views
250
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m planning to pour a 100mm deep concrete patio on 100mm hardcore. In order to achieve the same final height to line up with the rest of the patio, I...
Replies
6
Views
231
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock