Search the forum,

Discuss Very general question about working on gas pipes... in the USA area at PlumbersForums.net

Messages
38
A while before Christmas, we ended up needing the gas pipe feeding our gas hob moving a couple of inches to allow a new oven to slide in properly underneath..

I managed to find a local Gas Safe plumber to come out and do the job for a reasonable price. He explained in general terms what he proposed, and I left him to get on with it as I was working myself.

I know he ended up cutting and soldering a new bit of pipe on the gas supply, but I was wondering how you guys do that safely given your dealing with gas?

Do the pipes need purging before starting? As someone who has happily soldered normal 15mm & 22mm water pipes in the past, I have been curious about this for a while...

I have no intension of touching anything to do with gas, and this is just a very general question, so not looking for a "detailed how"...

Regards,

Peter
 
Pipes should be purged of gas at start. Its not a major job in a domestic setting. Gas pipes should be purged of air before relighting, again not a major job domestically.
 
Pipes should be purged of gas at start. Its not a major job in a domestic setting. Gas pipes should be purged of air before relighting, again not a major job domestically.
Thanks for that, much appreciated...I sort of assumed that would be how it was done, but wasn't sure...

In my case, the chap doing the work spent a bit of time going back and forth to the meter cupboard outside so I am guessing that's where he purged from...
 
Purely for interest, on large gas lines it is normal practice to purge with nitrogen before removing/replacing a section of gas line, the new section is then purged with nitrogen before admitting gas, this is to avoid a explosive mixture building up in the gas line. We used portable gas analyzers to check the gas content, these analyzers had two scales, 0 to 100% gas and 0 to 100% LEL (lower explosive limit) You first monitored on the 0 to 100% gas scale and then when the gas content fell to < 5% you changed to the 0 to 100% LEL scale, which is 0 to 100% of 5% and when this fell to 10 to 20%, (0.5% to 1% gas) the line was deemed safe to work on, or admit gas, after admitting gas you then purged with gas until the analyzer read 100% on the 0 to 100% gas scale. Gas has a flammable range of 5% to 15% (in air), it is not flammable if the concentration is below 5% or above 15%.
 
Last edited:

Reply to Very general question about working on gas pipes... in the USA area at PlumbersForums.net

Similar plumbing topics

We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is a 23.8Kw appliance with all six burners and oven on max. This was installed some 10 years ago and has passed all subsequent Gas Safety inspections as...
Replies
5
Views
413
I was stupid enough not to check the position of the pipes under the tiles when installing a toilet and drilled right through the center of a 16 mm copper water pipe. I exposed the pipe by removing a ~30cm section of the plastic sleeve and a ~10 cm section of the pipe around the hole. Several...
Replies
0
Views
183
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4 times since. It’s an upstairs bathroom, fed from a tank in the attic. The tank is about 8 Meters away and feeds a bath, sink and toilet. The tank...
Replies
9
Views
316
Creating content since 2001. Untold Media.

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock