- Messages
- 34,362
- Solutions
- 2
Thanks ric2013,
All pipes will be lagged in rockwool pipe insulation. Currently have no insulation under the suspended timber floor downstairs so getting under the floor this Weekend and insulating . Don't know weather to do all pipe work to the rads in plastic or copper?
Copper all day