Hi all, converting a gravity HW/pumped CH to fully pumped. All pipe less for those at the top of the old boiler are inaccessible, buried behind Kitchen units and under fitted wardrobes. This is what has been done so far:
Utilised the 28mm flow to cylinder for Flow to Air seperator-pump-bypass - 3 port.
Capped the old cylinder return
New CH flow from 3 port to old ch flow on top of old boiler
New cylinder return connected to old CH return then return to bloiler
Bypass into return.
New boiler fitted
returning in the morning to finish and commission
Have i missed anything obvious?
I asked the cust if any rads heat when only HW on, but this just led to a unclear answer and a argument between them both!!!!!!.......what issues would arrise if this was the case? I guess just one rad wouldnt work and would require re-piping.................
Cheers all
Utilised the 28mm flow to cylinder for Flow to Air seperator-pump-bypass - 3 port.
Capped the old cylinder return
New CH flow from 3 port to old ch flow on top of old boiler
New cylinder return connected to old CH return then return to bloiler
Bypass into return.
New boiler fitted
returning in the morning to finish and commission
Have i missed anything obvious?
I asked the cust if any rads heat when only HW on, but this just led to a unclear answer and a argument between them both!!!!!!.......what issues would arrise if this was the case? I guess just one rad wouldnt work and would require re-piping.................
Cheers all