D DavidJ Messages 10 Feb 10, 2018 #1 I'll be putting in new runs of copper for my bath / basin taps that will run under the floor and in the walls. Will capping the ends off and turning on the water be enough to check for leaks before tiling over?
I'll be putting in new runs of copper for my bath / basin taps that will run under the floor and in the walls. Will capping the ends off and turning on the water be enough to check for leaks before tiling over?
ShaunCorbs Super Moderator Staff member S. Mod Plumber Gas Engineer Subscribed Messages 34,363 Solutions 2 Feb 10, 2018 #2 Yes I would leave them a couple of days before doing anything
Deleted member 32524 Plumbers Arms member Plumber Gas Engineer Messages 725 Feb 10, 2018 #4 You are probably fitting isolation valves for future servicing, yes? Get a bit of plastic pipe and plumb to other side and stick it in to a bucket and open it up till water comes out, close again, check. let you crack on with the rest.
You are probably fitting isolation valves for future servicing, yes? Get a bit of plastic pipe and plumb to other side and stick it in to a bucket and open it up till water comes out, close again, check. let you crack on with the rest.