Discuss One gas meter to 3 properties in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
P

Plumberwales

Please advise, we have one commercial gas meter serving 3 buildings each with its own secondary ECV and test point after the main ECV and meter, we are RGI but not commercial, can't access the other two properties but need to do work in the 3rd property, we've isolated our ECV and carried out a tightness test on the property we need to work I and its passed. Do we still need to test the complete system or can we test, work, re-test from the secondary ECV or do we need to test all the properties. Btw were looking at installing a new combi
 
You need to ring GS, commercial property, you may not be aloud to fit the combi,
 
Status
Not open for further replies.

Reply to One gas meter to 3 properties in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

P
  • Question
Boiler is SIRIUS THREE FS 70 Potterton commercial. Situation: We are small building contractors and my labourers managed to damage the radiator...
Replies
2
Views
146
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
563
We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the...
Replies
5
Views
334
Hello all, I’m replacing a concrete paving slab patio in the back yard. The original patio used 50mm deep concrete slabs on hardcore & sand. I’m...
Replies
6
Views
327
Back