Yeah, that's what I mean... what things could go wrong at the point of 2nd fix? He's already (i) shown complete ignorance of building regs, (ii) messed up waste pipes, even on 2nd attempt, (iii) stuck down stone resin shower tray with silicone. I can't do much about (i) and (ii) has been partly resolved.

I don't really want to let him mess around fixing the shower tray issue, but if I can't find anyone else, are there many more things he could screw up during 2nd fix or has most of the damage been done?
 
TBH I would say most of the damage has been done second fix is the easy ish part
 
Ah, right... tough call to make then....

I can live with the OSB, even though it's not what we agreed.
I can live with the fact he made schoolboy errors when cutting out floorboards.
I'm not happy with the holes and notches, but can't do much about it now.
I'm not entirely happy with waste pipes, but they are at least better now and just about acceptable if I can tweak it to give it more of a fall.

But the shower tray issue is causing me to rethink things. What's the point of spending thousands of a new bathroom if there's a real risk of the tray cracking some unspecified time down the line? Replacing that would cost hundreds if not thousands given all the upheaval and retiling that would be required.

I think it's going to be a case of getting someone else in to finish the work or else accepting that the shower tray isn't installed as per the manufacturer's instructions and hoping it never cracks. Asking the current plumber to redo the tray is not an option I'm willing to consider.
 
Ah, right... tough call to make then..

I can live with the OSB, even though it's not what we agreed.
I can live with the fact he made schoolboy errors when cutting out floorboards.
I'm not happy with the holes and notches, but can't do much about it now.
I'm not entirely happy with waste pipes, but they are at least better now and just about acceptable if I can tweak it to give it more of a fall.

But the shower tray issue is causing me to rethink things. What's the point of spending thousands of a new bathroom if there's a real risk of the tray cracking some unspecified time down the line? Replacing that would cost hundreds if not thousands given all the upheaval and retiling that would be required.

I think it's going to be a case of getting someone else in to finish the work or else accepting that the shower tray isn't installed as per the manufacturer's instructions and hoping it never cracks. Asking the current plumber to redo the tray is not an option I'm willing to consider.

He needs sacking
Osb floor , seriously got to be a wind up this Siliconed resin tray , against all mi s which in turn foooks the guarantee which will no doubt come back to haunt you
Did he pva the osb before laying it or did he bosh it straight onto dusty osb
Are the walls aqua paneled or greenmoisture resistant plaster board
I would not be letting it go any further
Imo that tray needs to be redone ,.
 
IMG_2273.JPG
IMG_2273.JPG
IMG_2278.JPG


IMG_2274.JPG
 
heres a pic of a resin tray i had to take out as it had failed , installed on chipboard floor and siliconed down
The end result after approx 14 months in a rented property
Up to you mate
 
Trouble is another plumber would most likely not want to just do improvements to parts of that job. It would be better for the entire job to be done again so that a new plumber will get paid for all of it and feel happy to guarantee their work. I know, I have been there trying to fix and alter bits and pieces in bad work done in brand new bathrooms by others and it always annoyed me.
As to the question of how you agree a payment for part work between you and your plumber, should you or him decide to not continue, it is up to him to give you a bill, but also you can decide what to pay of it. Any materials useable plus any labour costs that were of acceptable work should be paid, but nothing else.
 
I'm actually starting to feel sorry for the OP now.

Yes, it is so unfair and the time factor and inconvenience to the OP is a problem. I just don't see why plumbers doing work like that with clearly no planning or much care should go unchallenged.
 
New posts
Status
Not open for further replies.

Reply to OK for waste to run uphill a short distance? in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Just started gound work on self build bungalow and wondering best way to do below ground soil pipes. For toilet I was going to go straight down...
Replies
2
Views
174
    • Like
Hello hello,, Hoping there are some experts or experienced Bulgarian plumbing chaps in this site ?. Here in the UK I can fit a bathroom just with...
Replies
2
Views
297
We have a utility room with a washing machine but no sink. Wife wants sink. There is room to fit one and the waste will connect to wahing machine...
Replies
22
Views
553
Hi, We're in the process of upgrading 2 bathrooms in our house: the ensuite and the family bathroom. These adjoin one another. The ensuite is...
Replies
3
Views
100
Hi all I really need some help or advise….. Back story….. Some years ago my dad had an extension to his house which included a newly built...
Replies
2
Views
352
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock