The walls are blocks but they are load bearing as there’s concrete floors.
Gas is going to run externally straight into the kitchens where the boilers will be.
Yes dot and dab.
If you go up and have drops you will have to have a false ceiling. The ceiling and adjoining walls will have to be fire rated so you cant have pipes sticking through everywhere.
This will have to be done anyway regardless of if there’s anything up there
The sites I've worked on haven't they just double boarded fire board on ceilings. No need for a false ceiling.
How did they fix it normally Battons to the ceiling
What the plasterboard? Either straight to the joists or yeah onto batons on the joists.
That doesn't get past the fact building control do not like pipes coming through causing holes into the fire protection. Not sure how electricians get round it but from past experiences your better off going down and up.
Reply to New Build Advice First Fix in the Plumbing Jobs | The Job-board area at PlumbersForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.