- Messages
- 10,444
How did you sort the wiring live issue out without taking the case off the boiler?thanks for all your reply's been in touch with Worcester bosch tec and explained the situation and they say a minimum of 1 metre but when this is done it will but about 2 metres , I've worked on high pressure cooling systems and control systems for broadcast transmitters I'm not touching the boiler just the water side thanks baz