Discuss New heating controls and wiring in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

jaydebruyne

Plumbers Arms member
Plumber
Gas Engineer
Messages
2,718
I just need confirmation I'm doing this right as per my drawing..

abc5f5093a30c43313cf20349927be79.jpg


Not sure if this is clear enough.. but...

I've replaced an old mechanical timer and room stat and had to rewire as custard wanted them relocated.

I was trying to do this without a wiring centre and it kept blowing the fuse lol

So... this is for a potterton heat only boiler serving heating only. They have a separate multipoint for hw.

I need to link permanent live to 1 on the programmer?
3 from programmer goes to 1 on room stat.
3 from room stat goes to switched live on boiler.
All permanent live for boiler and programmer you get from switched spur?

I'm pretty sure this is right but would like opinions please...

Cheers
 
Not a problem
 
It was as I thought. I didn't use a wiring centre in the end and got it all up and running in the end
 
Status
Not open for further replies.

Reply to New heating controls and wiring in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock