job was an office block and it included on first fix (all pipes tails were in rooms just needed re-new)
female toilets
male toilets
kitchen area which included first fix pipe work for electric water heaters
doc m pack
install water main high level 50 meters
second fix includes
female toilets
4xwc's plus wave flow sensors
4 x basins plus sensor taps and blenders
male toilets
1x wc plus wave flow sensor
2x basins plus sensor taps
1 x water less urinal
1x install doc m pack
kitchen includes
1 x sink
2x heatrae sadia water heaters
also heating
14x rads in iron tails within 2 meters on most
then obviously a commission
i know its only guess how much ,also dont forget possibility of call backs and time reading spec organising gear etc etc
so how much would you want to do a job like this???
job was an office block and it included on first fix (all pipes tails were in rooms just needed re-new)
female toilets
male toilets
kitchen area which included first fix pipe work for electric water heaters
doc m pack
install water main high level 50 meters
second fix includes
female toilets
4xwc's plus wave flow sensors
4 x basins plus sensor taps and blenders
male toilets
1x wc plus wave flow sensor
2x basins plus sensor taps
1 x water less urinal
1x install doc m pack
kitchen includes
1 x sink
2x heatrae sadia water heaters
also heating
14x rads in iron tails within 2 meters on most
then obviously a commission
i know its only guess how much ,also dont forget possibility of call backs and time reading spec organising gear etc etc