Discuss vaillant thermal fuse in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.

ambrosia

Plumbers Arms member
Plumber
Gas Engineer
Messages
892
with a vaillant ecotec, when the thermal fuse on the main heat exchanger goes is it possible to change it, I'm sure i've heard something about it not being possible, alson did a seach online and can only find the cable available as a spare
 
6 to 7 years, never been serviced, however in quite good condition except that fuse

1st time i've ever known one to go, and i've changed every other part of an ecotec
 
6 to 7 years, never been serviced, however in quite good condition except that fuse

1st time i've ever known one to go, and i've changed every other part of an ecotec

I've come across two up to now.
Both failed for no apparent reason.

Stupid idea!

The idea is that if it's overheated to the point we're that goes, it could have damaged the heat ex!
 
6 to 7 years, never been serviced, however in quite good condition except that fuse

1st time i've ever known one to go, and i've changed every other part of an ecotec

I've come across two up to now.
Both failed for no apparent reason.

Stupid idea!

The idea is that if it's overheated to the point we're that goes, it could have damaged the heat ex!
 
real easy and tempting to link that fuse out, easier than explaining to the customer about vaillants stupid idea to have an unchangable part
 
real easy and tempting to link that fuse out, easier than explaining to the customer about vaillants stupid idea to have an unchangable part

I know but then it falls on you.

I changed one complete boiler because the customer thought it better to do that and get the 7 years warranty instead of spending ÂŁ500 plus on changing heat ex.

The other was five years old and I created to the Rep about that part being unavailable and he arranged to sort it, which they did FOC
 
real easy and tempting to link that fuse out, easier than explaining to the customer about vaillants stupid idea to have an unchangable part

I know but then it falls on you.

I changed one complete boiler because the customer thought it better to do that and get the 7 years warranty instead of spending ÂŁ500 plus on changing heat ex.

The other was five years old and I created to the Rep about that part being unavailable and he arranged to sort it, which they did FOC
 
Status
Not open for further replies.

Reply to vaillant thermal fuse in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi everyone, I'm hoping to get some advice on an issue I'm having with my Vaillant Ecotec Pro 24 boiler (R1 PCB). It was installed in 2013 and has...
Replies
1
Views
214
Hello, I am looking for a heating engineer to diagnose and resolve an issue with my Vaillant EcoTec 832 combi boiler. Job Location: Copeland Rd...
Replies
1
Views
424
We have an all Vaillant setup - an EcoTEC Plus 637 system boiler plus wired VR720 and VR92 SensoCOMFORT controller, driving two CH zones plus DHW...
Replies
4
Views
598
Hi I'm dealing with Vaillant Ecotec 824 R1 in one flat. The boiler make a very loud noise when central heating is on - this is random and occurs...
Replies
0
Views
438
My heat only gas boiler is drained from the boiler drain valve - There is no water in the F&E tank. The hot water vented cylinder is removed. So...
Replies
1
Views
583
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock