hi all
just looked at a job where they want a new cold mains supply run outside and they want the sparky to fit trace heating to the mains supply as the old supply had burst (no lagging)
what im thinking of doing is running the new supply in 22 hep twin wall with lagging (19mm wall) then the sparky can fit his trace heating to the hep, question is is that ok? i know hep can take temps up to about 90c so in my mind it should be ok.
please feel free to say if its ok or not just need to run it pas someone else lol