P
pauls
my local chineese has had health and safety round and she has gone to town on the gas inspection report all jobs have been rectified less for a gas fired water heater balanced flue it has been noted as NCS on the report as it is 540mm from an internal corner.......... health and safety are saying this needs to be actioned ( the H&S woman dosent even know what she is looking for she was trying to point out the flue on the inside of the building then addmitted she doesnt really know what she is looking at).
im trying to explain that it is a NCS observation and will have complied to clearences when fitted how ever they have changed, there is no need to rip it out and re-locate.
any other thoughts on this please.......
im trying to explain that it is a NCS observation and will have complied to clearences when fitted how ever they have changed, there is no need to rip it out and re-locate.
any other thoughts on this please.......