Discuss Gola exam 6129 level 2 in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Hello everybody

I wanted to know as I am currently working towards 6129 Basic Plumbing Studies Level 2 full-time. I have been told that I can do the 6129 Domestic Plumbing Studies Level 3 full-time 1 year in September. When I have completed that and as there is a new qualification coming soon diploma 6189 - will I still be able to achieve 6089 NVQ Mechanical Engineering Services in Plumbing or will i do 6189 NVQ and will i be allowed to do that ! example 6129 and 6189 diploma :/

thank you
 
Hi everybody again,
Slightly unsure about two questions
Firstly, which one of the following gas boiler overcomes theneed for a cold water storage cistern, feed and expansion cistern and hot waterstorage vessels?
I am going with combinationboiler
Or Back boiler
Secondly, Why should a radiator be situated above a skirtingboard
I am going with Toallow the radiator to convert heat
Or to allow room for the vacuum cleaner
 
mo, dont want to pee on your bonfire and every credit for looking through your books and learning but do you know why for instance the water level in an f&e cistern should be below that of your CWSC?
 
Last edited by a moderator:
Hello everybody
Is there anbody who is registered onto Smartscreen. C&G 6129 Technical Certificate in Basic Plumbing Studies Level 2. Because I really need the practice sample papers for Enviromentall Awareness & Effective Working Relation.

Thank you
 
Mo

Don't want to be rude, but are you considering the C&G Level 3?

If so, do you think a pre-study course would assist you? i.e. itmay assist with some study skills etc.

Good luck mate

Rocket
 
Hello everybody

I've got my Sainitation exam tomorrow - need some help answering these questions below: Thank you

The required positions of rainwater pipes on a new building, can be indentified in the

1) Building Plan with undeground drainage systems details
2) Building specification with building material specifications
3) Plumbing specification with plumbing material specification
4) Work programme showing the different dwellings under construction

Which one of the following is a type of gutter pattern?

1) Mansard
2) Half round
3) Half channel
4) Elsan

An existing stainless steel sink has a 40mm sink drainer outlet, 40mm waste discharge pipe, 15mm cold water supply pipe direct from the mains, and a 15mm hot supply from a hot water storage cylinder. Which one of the following would be necessary if a food waste disposal unit is to be installed?

1) Increase the size of the waste discharge pipe to 50mm
2) Alter the cold supply to a cistern fed arrangement.
3) Increase the hot supply to 22mm
4) Change the sainless steel sink

Would these be correct if any wrong please help!
 
Number 2 then would definetly be 2) Half round

And the rest ''possibly'' ?

Cheers
 
2) Alter the cold supply to a cistern fed arrangement.

AND
3) Plumbing specification with plumbing material specification
 
2. no
3. no

one more chance lol
 
Last edited by a moderator:
Change the sainless steel sink

Building Plan with undeground drainage systems details
 
Because of the stainless steel diameter
Because Building Plan Document H deals with the positioning of rainwater system etc..
 
1. correct you need a bigger diameter opening for the waste disposal unit.
2. correct
 
final question

the fitting that should be used at the termination of a soil and vent pipe is a

a guarded bend
stright coupling
wire or plastic mesh cage
stand off pipe fastening

It's got to be guarded bend
 
Status
Not open for further replies.

Reply to Gola exam 6129 level 2 in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

Hi there, I'm sniffing around what to expect of getting a job in plumbing. My job makes me redundant at the end of September. The whole warehouse...
Replies
0
Views
738
    • Like
  • Locked
Hi all, Currently undergoing my level 2, hoping to get finished in the next few weeks. Looking to gain some experience, if anyone needs a mate...
Replies
1
Views
269
Hi everyone My 20 yr old son is about to complete his C&G level 2 in May and requires an apprenticeship to go on to Level 3 and eventually Gas...
Replies
4
Views
1K
Hello all, my name is Michael and I am 18. I have my level 2 and 3 qualifications in plumbing and I also have a full driving licence I cant find...
Replies
0
Views
375
I’m finding it hard breaking into the industry. I’m a trainee plumber living in London Hello, I'm a trainee plumber who lives in London who's...
Replies
4
Views
230
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock