Hi chaps, I need to do a boiler swop where the old boiler is right in the kitchen next to the boundary wall of a terrace house. In the viper it says you need to be 300mm from the boundary just incase they build an extension. Is it ok to still core out closer than this and use a plume management kit or buy another 45degree flue section and create the 300mm from inside? But as the cupboard is only 300mm deep the flue would be half way out the cupboard.
I hope that makes sense.
I hope that makes sense.