A
Aire
Yeah, so with regards to op's system, if I turned up, I would simply say because your installation is over 70kw, I can't work on it.Thanks Craig. Its the 70kw cut-off limit which I wasn't sure of. Does that mean that you can't work on any pipework on a system over 70 kw?
I thought a lot of the regs are based on purge volumes rather then the load of the system.