Discuss Indirect system in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Lol,there is a reason i did that lol,didnt want to cut the rising pipe back any more than it was,but i agree a bit of an eyeful!!,not enough gap for an offset,cheers for comment though,its noted .........
 
Lol,there is a reason i did that lol,didnt want to cut the rising pipe back any more than it was,but i agree a bit of an eyeful!!,not enough gap for an offset,cheers for comment though,its noted .........

Lol! You could have fitted the ballofix valve lower if needed & used a 90 degree fitting to the cistern valve tail & a bent piece of copper - or used solder elbow, if you didn't fancy doing an offset!
Nice steel wool job of pipe though! :smile:
 
Last edited:
Hi Sti B, you say that the person that you did this job for is a friend of yours ! is he still speaking to you ? for some-one who has been doing plunbing for 4 + years, this is a very poor standerd of work ! Did you get paid for this ?? Looks like total weekend DIY job, Monday morning wife calls plumber to put it right, the job is an eyesore ! you could have removed boxing and alterd pipe work, changed for chrome pipe (Yes you can get chrome fittings) Do you do this work part time ? You realy need to spend some time whth some-one who can point you in the right direction, or change your job, if you started work with me you would have been sent home by 10am.
 
JTS said....... You realy need to spend some time whth some-one who can point you in the right direction,

Thats why i joined the forum,cheers for your comments...............
 
looks like a french horn only joking steve b. i take it the person he needs to go out with is you is it jtsplumbing. all due and respect its must be brill coming out of college knowing absolutley everything about plumbing jts. i wish i was like you not having to learn anymore. anyway have you thought about doing a course on brain sugery as a side line im sure youll be the best at it.then theres quantum physics you could do on the weekend before you know it nobel prize. could you please send me your autograph
 
Last edited:
French horn lmao......see if i woulda been with phil today,that woulda made his day,takin micky outta me whilst lol watching me altering wc,dot worry i can take it lol,see you on next job lol........
 
Last edited by a moderator:
French horn lmao......see if i woulda been with phil today,that woulda made his day,takin mickey outta me whilst lol watching me altering wc,dot worry i can take it lol,see you on next job lol........

i look back at some of my jobs and think WTH was i thinking but, it was all learning and i would never do it ever again

as far as i can say is congratulations for completing the job on your own
well done for not having a leak
and top marks for making the waste work, they can be very diffucult to work with

keep up the good work
quality will come with experience ( not saying that what you done wasnt good)
 
Last edited by a moderator:
I'm afrain I'm having to agree with some of the coments on here about the look of it but I'll also try and offer a bit of constructive criticism.

I'd say your main problem has been a lack of planning with the pipework. Instead of spending a bit of time working out how you're going to do it, it looks like you've rushed in and made it up as you go along.

With the toilet I would have used an end feed tap connector and two end feed elbows, possibly a street in the ballofix if necessary and just gone straight across. It would have been quicker and looked a lot tidier.

With the basin I would have used two 45 bends to step the waste back to the wall and run the outlet from the chrome bottle trap straight back.
 
i agree with mike, with a bit of thought you could have done things better so they were more pleasing on the eye.
 
And I'll agree with jts plumbing over 4 years and you think that's good come on guys
 
Last edited by a moderator:
He may have been doin a little bit for 4 years. We prob do more in a week than ste b has done in that time

We've all gotten wet when we started

Give him a break

I know plumbers that have been doin it for 5 years. And they can't do a better job than that

And there's one in particular that is gas safe too!!!
 
Trouble with untidy plumbing on show is you will be judged by it. If I came to a house done like that, I would think, must be diyer, what else is done wrong, have they soldered right? etc. I tend to point out really ugly plumbing, or work liable to give trouble to the people.
Try to replace, hide pipes where possible.
 
Status
Not open for further replies.

Reply to Indirect system in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock