Users can remove all display ads (not sponsors) for a small fee. Click for info (must be logged in)

Discuss Two boiler install:- PRV location. (Pictures) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Status
Not open for further replies.
Harry lad, can you send a pm with your gsr details to gas man please, we'll get you into the private forum then.
 
All up and running! What do you all think?



https://m.************/MCSHeating/p...6908248382352/?type=3&source=54&ref=bookmarks


https://m.************/photo.php?fb...207520000.1449856681.&source=54&ref=bookmarks
 
very good effort harry and you should be proud couple of niggles for me personally

gas pipe would of liked it closer to the wall and the use or musson rings as dont like clip spaces (too many of them looks like 3 - 4)

no drain offs on return pipe work (bottom sets)

and blow off would of liked a set

but thats me and im picky :D
 
very good effort harry and you should be proud couple of niggles for me personally

gas pipe would of liked it closer to the wall and the use or musson rings as dont like clip spaces (too many of them looks like 3 - 4)

no drain offs on return pipe work (bottom sets)

and blow off would of liked a set

but thats me and im picky :D




There is a drain off hiding at the bootom of the three gate valves on the return ;) and there is also one on the return from the cylinder.

I agree about the clips however it was what was to hand at the time... Bould have been nice to use proper standoff clips but time wasnt permitting.

Im going back next week to flush and put inhibitor in:)
 
There is a drain off hiding at the bootom of the three gate valves on the return ;) and there is also one on the return from the cylinder.

I agree about the clips however it was what was to hand at the time... Bould have been nice to use proper standoff clips but time wasnt permitting.

Im going back next week to flush and put inhibitor in:)

you mean the lockshield valve :D

and yes but food for thought on the next one (were allways improving)

but good job on the 28 bending
 
Lock shield valve on there because I don't trust a drain off when flushing mains pressure haha

understand but whats why you put dedicated level valves in for flushing but fair enough as ive said before each to there own
 
Just needed some Munson rings to help with the levels and wider spacing otherwise it looks good. Good look with the lagging :)
 
Im sure Worcester do a pipe layout for coupling 2 boilers together showing where all the safety devices and NRVs are to be positioned .
 
Status
Not open for further replies.

Reply to Two boiler install:- PRV location. (Pictures) in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Similar plumbing topics

We are from Alberta, and I own an electrical company. I have been asked by a BC Mechanical P. Eng. to install an emergency STOP button at the...
Replies
5
Views
321
We run a community village hall and have a large kitchen provided for the use of hirers. This includes a Lincat SLR9 gas cooker which I believe is...
Replies
5
Views
550
Hi, Can anyone advise as to why the cold water to my bathroom keeps airlocking? This originally happened about 12 months ago and has happened 3-4...
Replies
9
Views
440
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock