s plan
The S-Plan or Sabotage Campaign or England Campaign was a campaign of bombing and sabotage against the civil, economic and military infrastructure of the United Kingdom from 1939 to 1940, conducted by members of the Irish Republican Army (IRA). It was conceived by Seamus O'Donovan in 1938 at the request of then IRA Chief of Staff Seán Russell. Russell and Joseph McGarrity are thought to have formulated the strategy in 1936.
I have a system upgraded in september that has developed a pipework vibration problem its not all the time checked the zone valves seem ok system running at 65 degrees speed 2 on a new Dab evo pump auto bypass fitted , gets quite loud for a short time then quietens down its not a air problem...
I have a customer with an open vent s-plan system. One of the 2 port valves is on the flow and the other on the return!!! whats that about? Never seen this before, both Heating & HW seem to be working. The boiler needs replacing & I really want to understand how the system works before doing any...
Hello All,
I recently brought a house that unfortunately turns out was a bit of a plumbing mess, The three port valve has failed and the heating did not work in part of the house. I am in the process of tidying up the plumbing in the airing cupboard and changing from a three port valve system...
Hi,
looking at which recommended controls to use Ie programmer plus 2 wireless programable room stats for each heating zone, I normally use Honeywell but pondering over a couple.
Thanks
Rob.
Can someone explain how an s plan heating system work from the sequences through the eletrics. So if I call for heating from the programmer it will send a signal to the room stat and so on and so forth...
Hi all,
New here to the forum.
Got a slight problem with my UFH. Have 3 valves, DHW, Rads and UFH.
Rads and DHW work fine using the programmers, switch on and off and heat up no problem.
However whenever the UFH is calling for heat, the flow pipe at the manifold barely gets warm. Its a 4...
Whats the going rate for a total re-wire of an S-plan with an unvented cylinder labour wise?
Good lord no.. I'am not getting some arsehole spark to do it.
I have now registered on the site as my original post as a guest(see below) was closed and I had a message suggested I register in order to get more answer (thanks again to those who already answered)
Here's the original post:
I have a standard vented S plan system and I'm about to increase...
I have a standard vented S plan system and I'm about to increase the sixe of a couple of radiators. I'll also take the opportunity to refill with new inhibitor.
My question is whether I need to manually open both S plan valves when I drain the system. I see no reference to this in any guides...
Unregistered
Thread
central
central heating
drain
draining
heating
heating system
manually
question
splansystem
Hi Guys
I currently have a combi boiler with a single prog stat wired direct to the boiler. I am putting in UFH in my kicthen diner and have to zone off using an S Plan Plus config. I have a Worcester Bosch boiler. I have drawn up the attached wiring diagram, would anyone be able to verify...
Zoning a property into upstairs and downstairs. Would you guys use a 3 channel programmer and normal wired stat or keep the 2 channel one and fit a programmable stat?
I Had a query from a customer recently who said the water was too hot coming from the taps.
The cylinder stat was set at 40.
previously they were having an issue with no HW
They said they recently had the PCB changed (incorrectly diagnosed by the previous engineer as admitted)
2...
Hey Guys, I'm new here and need some guidance with the below, hoping someone can help.
I was wondering if anyone can help me by providing a diagram to connect a sealed system on an S plan.
Thanks in advance.
Khurm Hussain
Thread
heating
help
splansealed
sealed system
system
ufh
under floor heating
underfloor
underfloor heating
Got to a job today where builders had done all ripping out.
installing combi..replacing cast iron boiler and cylinder.
Now ow im pretty happy sorting out most of pipework it's just that the flow from the boiler went to pump..then there's a gate valve by pass teed in and running into return...
I'm revising a system for a customer, it's a large property that really does need zoning but he is not keen on the idea of having all the floors up. In short, I'm going to remove an old heat only boiler and standard S Plan and have a system boiler run a primary circuit and install a low Loss...
Elforleather
Thread
boiler
header
oil
pump
pumps
running
splansingle
system
system boiler
using
wiring
Hi All
This is my 1st post as I'm an Electrician from the sparky forum
Anyway, this is probably my 5th s plan wiring job and haven't had any problems till now :(
existing Oil boiler downstairs
2x new tanks in loft fitted by plumber
2x HW valves in loft
1x CH valve in loft
1x standard...
jstephens
Thread
advice
color
customer
electrical
needed
plumber
programmer
splansystem
valve
i have got to change over a w plan system. If it was just changing to a Y plan, is it just a case of ptting in the new mid position valve and running a hot water off? Or, would you recommend changing it to an S plan?
Just in the middle of replacing some rads (thanks to all on here for the advice re. concrete floors). Whilst my friend was helping drain down, he noticed that my s plan has no bypass, whilst his does.
It's a standard vented system, and boiler is an old, but reliable Ideal Concord WRS.
Should I...