3mbar drop from meter to boiler, boiler connection is 15mm 1 meter from boiler, as it is suppose to be, then 22mm to meter 6 m,so pipe size not an issue,no allowance from connection to gas valve inlet test point.all the gas pipe work is under a concrete floor, serving a gas fire, whose pressure...