Yeah, they all 8mm bar the two in the end room. Because I'll be laying the pipe to that end room for a more direct boiler feed, then it would be very easy for my plumber to tie in the larger rad above the boiler, removing a good few metres of pipe as that rad would be on top of the new extended 22mm feed.
My only concern is the size of that room. It's 6.5x2.6 with a k1 600x1100 directly opposite the door, in the map it's slightly off as it would have obscured the boiler. It also has a k1 600x600 under the window
The window is only 1m square.... Double glazed
My only concern is the size of that room. It's 6.5x2.6 with a k1 600x1100 directly opposite the door, in the map it's slightly off as it would have obscured the boiler. It also has a k1 600x600 under the window
The window is only 1m square.... Double glazed