Sanke

Hi all
When laying out first fix pipes before the screed is laid how do you guys advise fixing the pipes ?
Ordinary pipe clips secured in concrete blocks between floor beams ? Or is there a recommended method ?
Thanks
 
Pipes shouldn't be laid in screed unless they are ducted or plastic pipe in pipe system. Pipe in pipe system nail clips. Copper standard clips.
 
Builder wants to just use felt lagging as that is what he has always done ! Pies will be laid for heating as well as hot/cold
 
walk away!

far far away
 
Doesn't comply with the water regulations regardless of what he's always done. Be wary as any comeback could be laid at your door.
 
Never use felt lagging in concrete or screed with copper pipes .. it gives off ammonia when wet which is fatal to copper might last a year if your lucky. Don't walk RUN!!!
 
copper will need to be covered in insulation tape minimium. Pipe in pipe would be a better option, especially for the hot and cold.
 
we use a bit of strapping to keep them down the galvanise strip with holes in sometimes called pattent band last few jobs theve plasted first and we had the rads to fix pipework to
 
if its only having water it the pipes, then use hep 20 or another brand of plastic barriered pipe as it doesnt react to the chemicals in the screed. also insulate them first with lagging then clip them down. laggin not only insultes the pipes but gives it room for slight expantion when covered in the screed and prevents cracking.
 
iv also made clips out of flattened copper pipe before to suit the width, which you can drill a hole at the sides for the screws. just shape it around the pipe. btw foam tube lagging is what i i use
 
if its only having water it the pipes, then use hep 20 or another brand of plastic barriered pipe as it doesnt react to the chemicals in the screed. also insulate them first with lagging then clip them down. laggin not only insultes the pipes but gives it room for slight expantion when covered in the screed and prevents cracking.
dont insult the pipe, wots it done to you ?? sorry mylesy couldnt help myself. no offence lol :)
 
Status
Not open for further replies.

Reply to First fix pipes before screed in the Plumbing Jobs | The Job-board area at PlumbersForums.net

Newest Plumbing Threads

Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock